R&M CASE STUDIES

Plantroom for Wembley Hilton

R&M Fixings and Support were commissioned to provide a secondary steel structure for a plantroom at the Wembley Hilton.

Detailed project schematics and drawings were required to demonstrate the proposed solution. The support was required because no connection to the soffit was possible due to dwellings on the floor above. Installation for the project was carried out by Rodell Mechanical Services.

The R&M system was used by Rodell in a further project following on from the completion of the plantroom project.